December 2022
Another project ready for delivery and install, this new waste system was designed, built and installed within 6 weeks just in time for our customers hectic season to start. A new design in web elevator with the ability to change all the rollers from the outside , even while its running. This will save a lot of downtime which is essential as this system going down brings the factory to a standstill.