Work has started on the next phase of expansion here at swan engineering.
We are adding a further 3200 square foot to our production facilities. This gives us essential workspace which allows fully built prototyping and assembly of new machinery which will in turn save time on the install by ironing out and potential issues before paint, and before turning up at site and hoping for the best.
This new area will boast a 5m wide x 6m high door, and 6 ton overhead crane lifting capacity. we hope to have the new building operational by the end of the summer.